Table 3

 Wellworks-2 OSH programme Essential Elements; mixed model experimental analysis of change scores

Essential ElementControl sites (n = 8), adjusted mean change score (SE)Intervention sites (n = 7), adjusted mean change score (SE)Two sided p value
Management commitment and employee participation (36/100)−0.42 (2.00)2.89 (2.03)0.03
Workplace analysis (28/100)0.85 (1.92)4.52 (2.00)0.12
Hazard prevention and control (24/100)2.16 (1.41)3.00 (1.50)0.68
Training and education (12/100)0.03 (0.57)0.25 (0.59)0.73
Total weighted programme score (100/100)3.16 (3.06)11.06 (3.27)0.11