Table 4

Summary of historical and contemporary measurements of total dust (personal samples) and tremolite asbestos (stationary samples) 1969–96 at companies A and B, respectively, by department and occupation

Company ACompany B
Department/
job task
Total dustTremolite asbestosDepartment/
job task
Total dustTremolite asbestos
nGM (mg/m3)4-150Range (mg/m3)nMaximum (fibres/ml)4-151nGM (mg/m3)4-150Range (mg/m3)nMaximum (fibres/ml)
Underground mine:Open cast mine:
 Drilling62.91.0–592<0.03 Drilling1112.50.2–781<0.03
 Charging910.93.4–68 Loading30.60.3–2.11<0.03
 Loading42.51.1–3.510.06 Lorry driving20.20.1–0.31<0.03
 Mixed6.04-153
Mill:Mill:
 Manual sorting1820.42.8–5620.10 Manual sorting611.81.9–5520.04
 Crushing1221.42.2–831<0.03 Crushing65.92.9–101<0.03
 Bagging3220.72.5–13640.12 Bagging921.75.0–5530.14
 Truck driving21.00.7–1.51<0.03 Truck driving33.93.1–4.910.05
 Service9.24-152  Service6.04-152
 Mixed18.34-153  Mixed10.14-153
 Other1.04-152  Other21.10.9–1.41<0.03
Lime works:Lime works:
 Mixing429.60.5–363<0.03 Mixing148.01.7–1730.03
 Bagging2113.22.9–7220.03 Truck driving22.31.2–4.61<0.03
 Truck driving20.40.4–0.51<0.03 Mixed5.74-153
 Mixed7.94-153  Other1.14-152
 Other0.44-152
Putty works:Putty works:
 Mixing146.02.4–1650.03 Mixing83.61.2–1140.03
 Truck driving21.30.9–1.81<0.03 Truck driving20.90.7–1.21<0.03
 Mixed4.64-153  Mixed2.74-153
 Other1.34-152  Other1.14-152
Total15823Total6820
  • 4-150 Geometric mean.

  • 4-151 Maximum values; all samples collected in 1996; aspect ratio ⩾5:1.

  • 4-152 Estimate.

  • 4-153 Weighted geometric mean (for details, see text).

  • —No data.